Nano Surface Protection for Commercial Spaces and Buildings
NASIOL TAIWAN

Nano Surface Protection for Commercial Spaces and Buildings

From lobbies and shared facilities to building exterior walls, plan transparent protection by material and user traffic patterns.

Schedule an On-Site Needs Assessment

First, let us understand your materials and needs

Hotels, shopping malls, office buildings, and community shared facilities often include several different materials. Planning starts with documenting the contamination, cleaning, and appearance requirements of each area, then selecting suitable surface protection for each material. Trial applications, work times, and follow-up maintenance are included in one proposal so management teams can clearly understand what will be delivered.

  • Lobbies, walls, and shared facilities in hotels, offices, and commercial spaces
  • Surface maintenance planning for community shared facilities and buildings before handover
  • Building exterior walls and outdoor metal facilities: assessed according to the substrate, finish, and work conditions

What needs to be confirmed before installation?

  • Compatibility must be confirmed separately for stone, metal, glass, and existing finishes. Agree on trial locations and appearance standards before large-area application.
  • Cracks, water leaks, rust, hollow areas, and substrate deterioration require the repair scope to be confirmed first. Surface coatings do not replace structural reinforcement or comprehensive waterproofing work.
  • For business premises, coordinate protection, work zones, and opening schedules. Confirm slip resistance separately for wet-area floors, and make separate safety arrangements for work at height and on exterior walls.

Four Steps from Assessment to Completion

01

Review of areas and maintenance requirements

Document the materials, areas, current-condition photos, and routine cleaning methods for each zone, and identify the issues most in need of improvement.

02

Confirm trial application and work plan

Confirm the appearance, compatibility, pre-treatment, and work arrangements, and detail the quote and acceptance criteria for each item.

03

Protection and application by zone

Coordinate with user traffic patterns and business hours, and complete protection, cleaning, and coating work according to the materials.

04

Acceptance and handover to management

Conduct acceptance within the confirmed scope and provide maintenance methods, usage restrictions, and agreed warranty terms for each area.

How are installation costs assessed?

We provide a quote based on the site conditions and confirmed scope. Key considerations include:

  • Area by zone, material types, surface condition, and required products
  • Existing dirt, wax layers, finishes, and any required cleaning or repair coordination
  • Business hours, protection of furniture and equipment, exterior wall height, and work access routes

Post-Installation Care and Warranty

Provide cleaning tools, restrictions on cleaning agents, and inspection procedures for each area’s material, and ensure management and cleaning staff understand the differences. Wear, sun exposure, salt spray, and cleaning methods affect how long the treatment lasts. Follow-up inspections and warranty coverage are subject to the written agreement for this project.

Warranty coverage is confirmed individually based on the product used, material, and installation scope. Applicable conditions and exclusions are governed by the written agreement.

Related Installation Projects

Kenting Villa Exterior Walls — Aesthetic and Durable Protection Project
Kenting, Pingtung County

Kenting Villa Exterior Walls — Aesthetic and Durable Protection Project

View the requirements, installation plan, and results →
Kuang Tien General Hospital, Taichung — Metal Art Installation Protection Project
Taichung City (Xiangshang Campus)

Kuang Tien General Hospital, Taichung — Metal Art Installation Protection Project

View the requirements, installation plan, and results →

Cost and Care Guide

Service contact, report inquiries, and warranty confirmation →

FAQ

Can the same product be used throughout an entire building?

Materials need to be evaluated separately. Different stone, glass, metal, and existing finishes may require different products and pre-treatment; the plan cannot be determined by total area alone.

Can the work be scheduled around business operations or residents’ use?

Please provide available work times and access requirements during the assessment. We will then confirm whether the work should be divided by area or phase, and arrange protection, curing, and reopening.

Can nano protection fix leaks in exterior walls?

Surface protection cannot serve as a complete waterproofing repair. First determine the condition of cracks, joints, and the substrate; any necessary repair work must be confirmed separately.

Can you provide information for a property management committee or owner to evaluate?

You can first provide photos, materials, area by zone, and management requirements. The service contact will confirm the available proposal, product information, work arrangements, and written warranty terms.